Skip to main content
Mills Memorial Hospital

Mills Memorial Hospital Replacement

  • 340,000 Square Feet
  • 78 Bed Facility

Projects / Institutional

Project info

Mills Memorial Hospital was an essential part of the Terrace community and had provided healthcare to the surrounding Northern BC region for decades. The original hospital opened in 1961, and over the years had undergone upgrades and renovations. Despite these improvements, the hospital needed to be replaced to meet the long-term requirements of the community and region.

Completed in 2024, the Ksyen Regional Hospital, formerly called Mills Memorial Hospital Redevelopment project, (78-bed facility) now serves as a regional center for trauma services, orthopedic surgeries, pathology, radiology, clinical support, and pharmacy services. In addition to the main hospital, a separate mental health facility, the Seven Sisters, was simultaneously built. This 10,000-square-foot, 25-bed facility adjacent to Ksyen offers long-term rehabilitation and recovery programs for adults living with serious and persistent mental illness.

Our Scope

Leveraging our multi-disciplinary teams, we delivered electrical and technology solutions for this project, including electrical, lighting, security, audio-visual, and structured cabling. In total, our teams installed over 800,000 feet of conduit, 3.5 million feet of wire, and 1.75 million feet of structured cabling.

Highlights from the project include a 25KV power distribution system down to panelboards, emergency generators, Uninterruptible Power Supply (UPS), lighting and lighting controls, and fire alarm.

Our technology solutions include structured cabling, intrusion detection, wired duress, Real-Time Locating System (RTLS), wireless duress, video surveillance, nurse call, access control, and infant abduction systems — all integrated through a single-pane platform that allows us to manage all the technology systems from one dashboard.

Thanks to the team’s hard work, dedication, and innovative thinking, the project was completed one month ahead of the substantial completion date.

Details

  • Sector: Institutional
  • Completion: 2024
  • Owner: Northern Health
  • Contractor: PCL Construction