TransLink Operations Control Centre 2

TransLink Operations Control Centre 2

  • 11,700 ft of TECK90 Cable
  • 2,500 ft of 288 Strand Fiber Cable
  • 24 5,000 lb UPS Cabinets

Projects / Infrastructure

Project info

TransLink is building a new state-of-the-art operations control centre to handle the growing SkyTrain network, making it more accessible and accommodating more trains for a smoother commuter experience. This expansion features a larger data centre and advanced automatic train controls, providing increased capacity for the growing network.

This centre is expected to be operational for the launch of the Broadway Subway extension and will support the future Surrey-Langley SkyTrain expansion when it’s ready. To ensure uninterrupted operations, this four-storey building includes robust UPS and generator systems.

We are providing electrical and technology solutions for the project, including electrical distribution, lighting, fire alarm, structured cabling, communications cabling, security, and lightning protection. Our team will be installing over 11,700 ft of TECK90 cable, 2,500 ft of 288 strand fiber cable, and 24 5,000 lb UPS cabinets to complete this advanced facility.

Details

  • Sector: Infrastructure
  • Completion: 2024
  • Owner: TransLink
  • Contractor: Smith Bros. & Wilson

To learn more about the project, visit SkyTrain Expansion Program.