Victoria International Airport—Hold BAggage Screening Recapitalization
Projects / Institutional
Project info
The Hold Bag Screening (HBS) Recapitalization project at the Victoria International Airport consisted of modifying the existing HBS system to improve passenger safety. The changes brought the security screening up to international standards and included improved explosive detection devices and computer tomography.
Our team provided electrical construction and control cabling for all four-way sorters, spiral power curves, and bag alignment devices VFDs. We installed photo eyes on cable trays mounted above the conveyor systems and terminated them back to five different control panels. All units were linked together via Ethernet IP so the client can remotely monitor from a control room what each drive unit is doing at all times.
Details
- Sector: Institutional
- Completion: 2017
- Owner: Victoria Airport Authority
- Contractor: Durwest Construction
- Awards: 2018 VRCA Awards of Excellence — Silver Winner | 2019 VICA Electrical Contractor Award
project Solutions
CLient testimonial
“Houle’s staff rose to this challenge with excellent management and planning from their entire team.”
Durwest Construction Management